Waldorf Astoria — Session 05 Material Selection
✏️ Edit title
Waldorf Astoria
· Main Contractor
· 2026-11-18
A. Reception Lobby
A.1 Hotel reception lobby
Open
11 material(s)
· 🖼️
· 2 more expected
A.2 Hotel lobby lounge 01
Open
9 material(s)
· 🖼️
A.3 Hotel lobby lounge 02
Open
11 material(s)
· 🖼️
A.4 Bulkhead A
Open
3 material(s)
· 🖼️
A.5 Wind lobby
Open
0 material(s)
· 🖼️
A.6 Lobby lounge bar
Open
5 material(s)
· 🖼️
A.7 Wall paneling
Open
0 material(s)
· 🖼️
A.8 Security window
Open
4 material(s)
· 🖼️
B. Lift Lobbies
B.1 Lift lobbies
Open
5 material(s)
· 🖼️
B.2 Left elevation
Open
4 material(s)
· 🖼️
B.3 Ballroom lobby
Open
5 material(s)
· 🖼️
B.4 Ballroom floor
Open
4 material(s)
· 🖼️
C. VIP Lobby
C.1 VIP Plan
Open
6 material(s)
· 🖼️
C.2 VIP elevation
Open
5 material(s)
· 🖼️
C.3 VIP toilets
Open
8 material(s)
· 🖼️
C.4 VIP toilets details
Open
8 material(s)
· 🖼️
E. Blossom Lounge
E.7 Maitre D
Open
4 material(s)
· 🖼️
E.8 Waiter Stn
Open
3 material(s)
· 🖼️
E.9 Mirror Clad
Open
5 material(s)
· 🖼️
E.10 Toilets
Open
10 material(s)
· 🖼️
E.11 Toilet Corr
Open
3 material(s)
· 🖼️
· 1 more expected
E.12 Female Vanity
Open
5 material(s)
· 🖼️
E.13 Grooming Stn
Open
6 material(s)
· 🖼️
Other
Service Elevator
Open
8 material(s)